• Spieth, Space solutions
    More Than 18 Years Manufacturing & Exporting
Home/News/Product News/What should be paid attention to when installing the mobile dock ramp?
Product News

What should be paid attention to when installing the mobile dock ramp?

Time:3/2/2020718
Share:
Nowadays,with the development of the global economy, many industries are also developing. In this case, it is no surprise that the product of mobile loading dock ramps appears. Although everyone is familiar with this product. But can you really understand the use and installation of the container ramp for forklift ? Next, we will introduce the precautions when installing the container load ramp.
In terms of installation, there are different specific requirements for different components. Therefore, the learning and understanding of installation of container unloading ramp should be treated differently for different components or parts, rather than all of them mixed together, which is not conducive to the mastery of knowledge, but also affects the learning effect.
As for the installation of warehouse steel dock ramp, let's first understand several aspects
1. Electrical
(1) For its grounding resistance, it shall be measured to see whether its value meets the specified requirements and is within the normal range. If any abnormality is detected, measures shall be taken to solve it without delay.
(2) For the control switch, it mainly depends on whether it can work normally and whether it can play its due protective role.
(3) For motors, it depends on whether they are installed correctly and in place. Moreover, whether the rotation direction is the same as the marking direction.
2. Guide rail.
The installation of the guide rail is also the key point in the installation of the mobile boarding bridge. For it, its focus is:
Before installation, the guide rail should be lubricated, mainly by applying a proper amount of grease, so that it has a good lubrication state. For the perpendicularity of guide rail, there is allowable deviation. -Generally, it is within 90mm. If necessary, wall bracket can be installed.
3. Wall frame of mobile boarding bridge
For the wall frame of mobile boarding bridge, its installation requirements are not much, because its installation is simple. Specifically speaking, the installation requirements are: for the first installation, the distance between it and the bottom surface shall be 4.5-6m. After that, it was 9 M. For its horizontal inclination, it should be within 10 degrees.
With regard to the installation of portable dock ramps, through the introduction of these aspects, I believe that everyone has certain knowledge, rather than the installation for the sake of installation. The installation still requires a certain degree of common sense and installation knowledge.
mobile dock ramp

Send Message
if you have questions or suggestions,please leave us a message,we will reply you as soon as we can
ONLINE SERVICE
0
Browsing History